Timeline of the CESNET Data Centers

Data Center Year of Deployment Decommission
DU1 1/2014 9/2019
DU2 11/2012 12/2019
DU3 9/2020
DU4 11/2017 in operation
DU5 12/2018 in operation
CL1 1/2019 in operation
CL2 1/2020 in operation
CL3 3/2022 in operation


Pilsen

Pilsen data center utilizes three-layer model, where the highest layer is represented by fast FC (Fiber Channel) hard disks , second layer consists of SATA HDD and the lowest layer consists of tape library. Data center is in operation since May 2012. It has 500 TiB of hard disks , 3584 TiB of switchable hard disks and 4,8 PiB of tapes (extendable up to 5,5 PiB by providing extra tape media).

Datacenter pictures :cs:plzen


html

Jihlava

Tier 1 consists from two single disk arrays DCS3700 with 342 pcs of 3 TiB SAS HDD. The hard disks are splitted into 32x (8+2) + 2x (6+2) RAID6 groups. Six hard disks are configured such a spare hard disks . Total net capacity of Tier1 array is 804 TiB. Tier 2 consists on the one hand from 7 pcs of MAID arrays Promise Vess R2600fiD and on the second hand from the tape library IBM TS3500. In the MAID arrays is in total installed 734 pcs of 4 TiB HDD. Those hard disks are splitted into 41 groups of RAID6 (16+2). There are 4 hard disks used as a spare hard disks in each disk array. In total is thus available 648 data hard disks with net capacity 2496 TiB. Tape library TS3500 has capacity 3744 TiB.

Datacenter pictures :cs:jihlava


Brno

Tier 1 consists of two disk arrays DCS3700 with 4 TiB capacity. Tier 2 consists on one hand of 3 pcs of MAID array Proware EP-4643S and on the second hand of tape library IBM TS3500. Usable capacity of MAID arrays is 2116 TiB and 3520 TiB in case of tape library.

Datacenter pictures :cs:brno